Decks

Deck building & repair

New composite or wood decks, railings, stairs, and structural repairs—footings, framing, and hardware built to code for Maryland weather. Not a floating platform that sags after the first winter.

At a glance

Timeline

Most decks: 1–3 weeks from permit-ready start (size and material dependent)

Scope

New composite or wood decks, railings, stairs, and structural repairs—footings, framing, and hardware built to code for Maryland weather. Not a floating platform that sags after the first winter.

Best for

Homeowners replacing a rotted deck, adding outdoor living space, or fixing railings and stairs that failed inspection

What's included

  • On-site consultation and written estimate
  • Footings, framing, decking, and railings as scoped
  • Composite or pressure-treated options discussed upfront
  • Cleanup and final walkthrough

How it works

  1. 1

    Walk the site

    We look at the existing deck or empty space, access, height, and how you want to use it. We will tell you if the footings or ledger need work before new boards go down.

  2. 2

    Material, scope, and price in writing

    Composite vs. wood, railing style, stairs, and permit requirements spelled out before we order lumber—not a verbal ballpark that changes on day two.

  3. 3

    Build, inspect, and hand off

    Footings poured, framing square, hardware correct, boards and railings installed. We walk the finished deck with you before closeout.

What to expect

Helpful to have ready

  • Know roughly how big you want the deck and whether you prefer composite or wood
  • Photos of decks you like help—railing style, board direction, stair layout
  • Clear access to the yard and house wall on consultation day

May not be the right fit if

  • You only need a single board replaced on an otherwise solid deck—we may handle it; call first
  • You want a permit-free build where code requires permits—we will not skip that step

Common questions

Composite or wood—which do you recommend?
Depends on budget, sun exposure, and how much maintenance you want. We walk through both on the site visit with realistic cost and upkeep—not a one-size pitch.
Do you handle permits for decks?
Yes when required. Permit scope and timeline are part of the written estimate.
Can you tie deck lighting into our electrical work?
Yes—that is one reason homeowners hire us for decks and electrical on the same crew. Outlets, post lights, and stair lighting can be scoped together.

Request your deck estimate

Tell us about the deck—new build, rebuild, or repair—we respond within one business day.